Bulk Water Meter Installation and Water Collection And Installation Of Bulk Storage Tank + Booster PumpCivil Engineering
Installation Of Reverse Osmosis Water Treatment System And Construction Of 450mm U-drain with Cover SlabsCivil Engineering
Contruction Of Underground Bulk Septic Tank/Laying Of All Electrical And Data Ducts On CompoundExternal Works
Contruction Of Car Park (Pavement Blocks and Stamp Concrete)/Asphalt Patching Works And WashingExternal Works
Construction Of Security And Services House And Installation Of Gate And Construction Of Fends WallsCommercial
laying-of-100mm-diameter-hdpe-pipes-including-fittings-350mm-diameter-upvc-class-c-sewage-pipesCivil Engineering