Project Title :Contruction Of 8m Stretch Of Surfacing Road In The Surfacing Road In The Estate Location :Drakes Avenue Phase 2,3,4,5 & 6 Airport, Accra Client : Goldkey Properties Ltd
Details Bulk Water Meter Installation and Water Collection And Installation Of Bulk Storage Tank + Booster Pump
Details Installation Of Reverse Osmosis Water Treatment System And Construction Of 450mm U-drain with Cover Slabs